KAZALCI OKOLJA

You are here

Key message
Good

At the end of 2019, the total floor area of energy-renovated buildings in the public sector amounted to 1.71 million m2, which exceeds the indicative annual target by 8%. In 2019, more than 187,000 m2 were renovated, which is 28% less than the previous year and also significantly less than in the period 2013−2015. According to currently available data, the total floor area of energy-renovated public buildings will reach 1.84 million m2 in 2020, which will exceed the target value for this year by 3%. Together with this indicator, it is also necessary to consider the results of indicators for monitoring the CO2 emissions reduction and final energy savings achieved through the implementation of measures in the public sector.


Charts

Figure PO08-1: Cumulative floor area of energy-renovated buildings in the public sector in the period 2011−2019, expected value of the indicator in 2020 and its target values up to 2020
Sources: 

Jožef Stefan Institute - Energy Efficiency Centre

Show data

Target values of the indicator

Indicator values in the period 2011−2019

Expected value of the indicator in 2020

2011

0

2012

63.27

63.27

2013

301.04

522.62

2014

538.82

972.66

2015

776.59

1261.72

2016

980.28

1261.72

2017

1183.97

1265.05

2018

1387.66

1526.99

2019

1591.35

1714.38

1714.38

2020

1795.04

1841.43


The indicator methodology is available only in Slovene (link to the indicator)


SLEDI NAM

TWITTER